ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Testing laboratories
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $471k 43k
MMBtu
$12.30
- Electrical $237k 3,315k
kWh
$0.084
- Natural Gas $28k 4.4k
MMBtu
$7.38

70

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 3.7k
MMBtu
8.8%
- Electrical $33k 364k
kWh
11.0%
- Natural Gas $5.9k -
MMBtu
-
Waste $0.2k
Productivity/Other $0.0k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $550k 51k
MMBtu
$11.16
- Electrical $271k 3,924k
kWh
$0.074
- Natural Gas $34k 5.3k
MMBtu
$7.85

19

Implemented Recommendations

2.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.4k
MMBtu
2.7%
- Electrical $7.4k 135k
kWh
3.4%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $13k