ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Activities related to real estate
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $68k 5.7k
MMBtu
$12.02
- Electrical $32k 276k
kWh
$0.12
- Natural Gas $29k 2.9k
MMBtu
$6.86

11

Recommendations

3.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 1.1k
MMBtu
19.8%
- Electrical $14k 110k
kWh
39.8%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $61k 5.3k
MMBtu
$11.66
- Electrical $10k 102k
kWh
$0.11
- Natural Gas $43k 4.3k
MMBtu
$10.29

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 0.1k
MMBtu
2.4%
- Electrical $1.4k 12k
kWh
12.2%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall