ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Lessors of other real estate property
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $157k 19k
MMBtu
$9.56
- Electrical $70k 1,582k
kWh
$0.048
- Natural Gas $24k 2.4k
MMBtu
$10.08

15

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 3.6k
MMBtu
19.6%
- Electrical $16k 355k
kWh
22.5%
- Natural Gas $4.8k -
MMBtu
-
Waste $3.9k
Productivity/Other $2.6k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $157k 19k
MMBtu
$9.56
- Electrical $70k 1,582k
kWh
$0.048
- Natural Gas $24k 2.4k
MMBtu
$10.08

9

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.2k
MMBtu
17.0%
- Electrical $13k 308k
kWh
19.5%
- Natural Gas $3.3k -
MMBtu
-
Waste $3.9k
Productivity/Other -
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall