Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Lessors of real estate
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $81k 8.8k
MMBtu
$11.48
- Electrical $40k 737k
kWh
$0.089
- Natural Gas $12k 1.2k
MMBtu
$12.37

31

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.5k
MMBtu
27.9%
- Electrical $18k 239k
kWh
32.5%
- Natural Gas $2.6k -
MMBtu
-
Waste $1.6k
Productivity/Other $1.1k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $81k 8.8k
MMBtu
$11.48
- Electrical $40k 737k
kWh
$0.089
- Natural Gas $12k 1.2k
MMBtu
$12.37

12

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.3k
MMBtu
15.2%
- Electrical $6.0k 130k
kWh
17.6%
- Natural Gas $1.3k -
MMBtu
-
Waste $1.6k
Productivity/Other $0.1k
TOTAL $18k