ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Real estate
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $76k 7.6k
MMBtu
$11.68
- Electrical $37k 564k
kWh
$0.099
- Natural Gas $18k 1.8k
MMBtu
$10.30

42

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.0k
MMBtu
25.6%
- Electrical $16k 191k
kWh
33.8%
- Natural Gas $7.9k -
MMBtu
-
Waste $1.0k
Productivity/Other $0.9k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $98k 10k
MMBtu
$11.97
- Electrical $39k 729k
kWh
$0.087
- Natural Gas $27k 2.7k
MMBtu
$12.57

14

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.3k
MMBtu
12.9%
- Electrical $5.9k 128k
kWh
17.6%
- Natural Gas $7.4k -
MMBtu
-
Waste $1.6k
Productivity/Other -
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall