The ITAC Statistics page displays the average assessment results for the selected criteria.
8
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $76k | 7.6k |
MMBtu
|
$11.68 |
- Electrical | $37k | 564k |
kWh
|
$0.099 |
- Natural Gas | $18k | 1.8k |
MMBtu
|
$10.30 |
42
Recommendations
5.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $30k | 2.0k |
MMBtu
|
25.6% |
- Electrical | $16k | 191k |
kWh
|
33.8% |
- Natural Gas | $7.9k | - |
MMBtu
|
- |
Waste | $1.0k | |||
Productivity/Other | $0.9k | |||
TOTAL | $32k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $98k | 10k |
MMBtu
|
$11.97 |
- Electrical | $39k | 729k |
kWh
|
$0.087 |
- Natural Gas | $27k | 2.7k |
MMBtu
|
$12.57 |
14
Implemented Recommendations
2.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $22k | 1.3k |
MMBtu
|
12.9% |
- Electrical | $5.9k | 128k |
kWh
|
17.6% |
- Natural Gas | $7.4k | - |
MMBtu
|
- |
Waste | $1.6k | |||
Productivity/Other | - | |||
TOTAL | $24k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |