The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $71k | 5.3k |
MMBtu
|
$13.49 |
- Electrical | $65k | 487k |
kWh
|
$0.13 |
- Natural Gas | $5.8k | 0.3k |
MMBtu
|
$20.86 |
3
Recommendations
3.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $18k | 1.2k |
MMBtu
|
22.5% |
- Electrical | $18k | 116k |
kWh
|
23.7% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $18k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
0
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
0
Implemented Recommendations
0.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | - | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |