ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Depository credit intermediation
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $109k 9.3k
MMBtu
$12.23
- Electrical $78k 795k
kWh
$0.11
- Natural Gas $11k 1.1k
MMBtu
$14.37

7

Recommendations

3.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.7k
MMBtu
18.6%
- Electrical $18k 169k
kWh
21.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $146k 13k
MMBtu
$10.98
- Electrical $91k 1,103k
kWh
$0.082
- Natural Gas $16k 2.0k
MMBtu
$7.88

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.1k
MMBtu
8.5%
- Electrical $9.1k 111k
kWh
10.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $2.1k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall