ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Libraries and archives
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $162k 14k
MMBtu
$11.46
- Electrical $65k 1,041k
kWh
$0.085
- Natural Gas $12k 1.0k
MMBtu
$9.49

44

Recommendations

4.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.9k
MMBtu
20.3%
- Electrical $21k 287k
kWh
27.6%
- Natural Gas $4.6k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $201k 18k
MMBtu
$11.64
- Electrical $77k 1,239k
kWh
$0.096
- Natural Gas $14k 1.2k
MMBtu
$10.09

14

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.5k
MMBtu
8.2%
- Electrical $9.0k 143k
kWh
11.6%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $12k
*May be negative reflecting an increased cost component required to save energy and costs overall