The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $107k | 8.7k |
MMBtu
|
$11.29 |
- Electrical | $77k | 616k |
kWh
|
$0.11 |
- Natural Gas | $27k | 2.4k |
MMBtu
|
$10.58 |
17
Recommendations
8.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $53k | 2.0k |
MMBtu
|
22.8% |
- Electrical | $17k | 193k |
kWh
|
31.4% |
- Natural Gas | $14k | - |
MMBtu
|
- |
Waste | $0.2k | |||
Productivity/Other | $55k | |||
TOTAL | $108k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
2
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $107k | 8.7k |
MMBtu
|
$11.29 |
- Electrical | $77k | 616k |
kWh
|
$0.11 |
- Natural Gas | $27k | 2.4k |
MMBtu
|
$10.58 |
12
Implemented Recommendations
6.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $20k | 1.6k |
MMBtu
|
18.1% |
- Electrical | $14k | 153k |
kWh
|
24.8% |
- Natural Gas | $5.3k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $55k | |||
TOTAL | $74k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |