ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other publishers
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $107k 8.7k
MMBtu
$11.29
- Electrical $77k 616k
kWh
$0.11
- Natural Gas $27k 2.4k
MMBtu
$10.58

17

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 2.0k
MMBtu
22.8%
- Electrical $17k 193k
kWh
31.4%
- Natural Gas $14k -
MMBtu
-
Waste $0.2k
Productivity/Other $55k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $107k 8.7k
MMBtu
$11.29
- Electrical $77k 616k
kWh
$0.11
- Natural Gas $27k 2.4k
MMBtu
$10.58

12

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.6k
MMBtu
18.1%
- Electrical $14k 153k
kWh
24.8%
- Natural Gas $5.3k -
MMBtu
-
Waste -
Productivity/Other $55k
TOTAL $74k