The ITAC Statistics page displays the average assessment results for the selected criteria.
37
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $538k | 64k |
MMBtu
|
$9.99 |
- Electrical | $379k | 5,814k |
kWh
|
$0.077 |
- Natural Gas | $27k | 3.3k |
MMBtu
|
$7.46 |
270
Recommendations
7.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $61k | 6.9k |
MMBtu
|
10.8% |
- Electrical | $48k | 671k |
kWh
|
11.5% |
- Natural Gas | $2.7k | - |
MMBtu
|
- |
Waste | $1.4k | |||
Productivity/Other | $117k | |||
TOTAL | $179k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
35
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $561k | 67k |
MMBtu
|
$9.65 |
- Electrical | $397k | 6,094k |
kWh
|
$0.077 |
- Natural Gas | $28k | 3.5k |
MMBtu
|
$7.08 |
96
Implemented Recommendations
2.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $24k | 3.0k |
MMBtu
|
4.5% |
- Electrical | $22k | 290k |
kWh
|
4.8% |
- Natural Gas | $0.4k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $3.4k | |||
TOTAL | $28k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |