ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,489k 205k
MMBtu
$13.78
- Electrical $263k 4,951k
kWh
$0.094
- Natural Gas $1,056k 153k
MMBtu
$6.61

17

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $189k 1.5k
MMBtu
0.7%
- Electrical $16k 143k
kWh
2.9%
- Natural Gas $149k -
MMBtu
-
Waste $1.4k
Productivity/Other $88k
TOTAL $279k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,178k 303k
MMBtu
$14.33
- Electrical $354k 7,115k
kWh
$0.077
- Natural Gas $1,568k 228k
MMBtu
$3.44

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 0.4k
MMBtu
0.1%
- Electrical $3.7k 35k
kWh
0.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $132k
TOTAL $142k
*May be negative reflecting an increased cost component required to save energy and costs overall