ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Refrigerated warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $223k 28k
MMBtu
$10.09
- Electrical $139k 2,337k
kWh
$0.071
- Natural Gas $23k 3.9k
MMBtu
$2.58

46

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 4.9k
MMBtu
17.6%
- Electrical $33k 482k
kWh
20.6%
- Natural Gas -
-
MMBtu
-
Waste $0.2k
Productivity/Other $46k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $202k 25k
MMBtu
$10.52
- Electrical $117k 2,021k
kWh
$0.072
- Natural Gas $23k 4.0k
MMBtu
$1.92

28

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.5k
MMBtu
13.9%
- Electrical $25k 340k
kWh
16.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall