ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS General warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 42k
MMBtu
$8.55
- Electrical $173k 2,857k
kWh
$0.078
- Natural Gas $51k 13k
MMBtu
$4.28

87

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 5.5k
MMBtu
12.9%
- Electrical $30k 533k
kWh
18.6%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other $7.1k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $307k 40k
MMBtu
$8.63
- Electrical $187k 3,028k
kWh
$0.073
- Natural Gas $52k 9.3k
MMBtu
$4.11

39

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.1k
MMBtu
10.2%
- Electrical $23k 401k
kWh
13.2%
- Natural Gas $3.0k -
MMBtu
-
Waste -
Productivity/Other $3.9k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall