ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $611k 70k
MMBtu
$9.99
- Electrical $302k 4,395k
kWh
$0.078
- Natural Gas $152k 25k
MMBtu
$3.10

170

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 5.8k
MMBtu
8.2%
- Electrical $42k 562k
kWh
12.8%
- Natural Gas $24k -
MMBtu
-
Waste $0.2k
Productivity/Other $26k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $482k 64k
MMBtu
$9.45
- Electrical $186k 3,269k
kWh
$0.069
- Natural Gas $203k 31k
MMBtu
$3.35

70

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.5k
MMBtu
5.4%
- Electrical $21k 340k
kWh
10.4%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall