ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $624k 65k
MMBtu
$11.32
- Electrical $349k 4,382k
kWh
$0.089
- Natural Gas $122k 20k
MMBtu
$3.90

211

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 7.8k
MMBtu
12.0%
- Electrical $69k 763k
kWh
17.4%
- Natural Gas $20k -
MMBtu
-
Waste $0.2k
Productivity/Other $23k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 58k
MMBtu
$9.60
- Electrical $177k 2,980k
kWh
$0.078
- Natural Gas $165k 27k
MMBtu
$3.49

78

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 3.0k
MMBtu
5.1%
- Electrical $18k 289k
kWh
9.7%
- Natural Gas $2.3k -
MMBtu
-
Waste -
Productivity/Other $13k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall