ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $655k 69k
MMBtu
$10.71
- Electrical $365k 4,615k
kWh
$0.085
- Natural Gas $129k 21k
MMBtu
$3.62

201

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 8.0k
MMBtu
11.7%
- Electrical $69k 784k
kWh
17.0%
- Natural Gas $21k -
MMBtu
-
Waste $0.2k
Productivity/Other $24k
TOTAL $132k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $448k 60k
MMBtu
$9.50
- Electrical $184k 3,101k
kWh
$0.075
- Natural Gas $171k 28k
MMBtu
$3.22

76

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 3.1k
MMBtu
5.1%
- Electrical $19k 300k
kWh
9.7%
- Natural Gas $1.9k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall