ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Freight transportation arrangement
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $723k 110k
MMBtu
$6.60
- Electrical $552k 10,687k
kWh
$0.052
- Natural Gas -
-
MMBtu
-

9

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $563k 120k
MMBtu
109.1%
- Electrical $606k 11,662k
kWh
109.1%
- Natural Gas ($-115.0)k -
MMBtu
-
Waste -
Productivity/Other ($-85.0)k
TOTAL $478k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $723k 110k
MMBtu
$6.60
- Electrical $552k 10,687k
kWh
$0.052
- Natural Gas -
-
MMBtu
-

7

Implemented Recommendations

7.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 16k
MMBtu
14.3%
- Electrical $79k 1,529k
kWh
14.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall