ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other support activities for air transportation
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 24k
MMBtu
$11.75
- Electrical $117k 1,551k
kWh
$0.082
- Natural Gas $82k 8.5k
MMBtu
$10.62

23

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.9k
MMBtu
12.1%
- Electrical $20k 287k
kWh
18.5%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $2.2k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $314k 31k
MMBtu
$11.38
- Electrical $123k 1,835k
kWh
$0.070
- Natural Gas $113k 12k
MMBtu
$8.73

3

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.6k
MMBtu
8.3%
- Electrical $17k 250k
kWh
13.6%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.8k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall