ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Airport operations
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $172k 8.2k
MMBtu
$17.97
- Electrical $29k 357k
kWh
$0.10
- Natural Gas $15k 1.8k
MMBtu
$10.42

24

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.4k
MMBtu
16.6%
- Electrical $9.6k 132k
kWh
37.1%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $1.6k
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $204k 8.8k
MMBtu
$20.07
- Electrical $22k 346k
kWh
$0.090
- Natural Gas $14k 1.7k
MMBtu
$11.28

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.8k 0.7k
MMBtu
7.8%
- Electrical $4.9k 67k
kWh
19.4%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $7.0k
*May be negative reflecting an increased cost component required to save energy and costs overall