ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Support activities for air transportation
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $201k 15k
MMBtu
$14.44
- Electrical $65k 932k
kWh
$0.086
- Natural Gas $43k 4.6k
MMBtu
$10.39

50

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.2k
MMBtu
14.2%
- Electrical $14k 215k
kWh
23.0%
- Natural Gas $1.8k -
MMBtu
-
Waste -
Productivity/Other $1.6k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $208k 15k
MMBtu
$15.30
- Electrical $67k 868k
kWh
$0.093
- Natural Gas $43k 4.7k
MMBtu
$10.51

14

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.8k 1.0k
MMBtu
6.9%
- Electrical $7.0k 101k
kWh
11.7%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $8.1k
*May be negative reflecting an increased cost component required to save energy and costs overall