ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Support activities for transportation
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 27k
MMBtu
$14.34
- Electrical $146k 1,950k
kWh
$0.093
- Natural Gas $40k 4.8k
MMBtu
$8.63

91

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 13k
MMBtu
47.3%
- Electrical $78k 1,249k
kWh
64.0%
- Natural Gas ($-5.8)k -
MMBtu
-
Waste -
Productivity/Other ($-5.9)k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $318k 30k
MMBtu
$13.96
- Electrical $138k 2,111k
kWh
$0.081
- Natural Gas $47k 5.5k
MMBtu
$8.01

26

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 2.4k
MMBtu
8.1%
- Electrical $14k 236k
kWh
11.2%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall