ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 488 Support activities for transportation

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 27k
MMBtu
$14.34
- Electrical $146k 1,950k
kWh
$0.093
- Natural Gas $40k 4.8k
MMBtu
$8.63

91

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 13k
MMBtu
47.3%
- Electrical $78k 1,249k
kWh
64.0%
- Natural Gas ($-5.8)k -
MMBtu
-
Waste -
Productivity/Other ($-5.9)k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $338k 32k
MMBtu
$14.12
- Electrical $142k 2,236k
kWh
$0.079
- Natural Gas $50k 5.9k
MMBtu
$7.30

26

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.7k
MMBtu
8.4%
- Electrical $15k 262k
kWh
11.7%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall