ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Support activities for transportation
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $305k 27k
MMBtu
$14.34
- Electrical $146k 1,950k
kWh
$0.093
- Natural Gas $40k 4.8k
MMBtu
$8.63

91

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 13k
MMBtu
47.3%
- Electrical $78k 1,249k
kWh
64.0%
- Natural Gas ($-5.8)k -
MMBtu
-
Waste -
Productivity/Other ($-5.9)k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $338k 32k
MMBtu
$14.12
- Electrical $142k 2,236k
kWh
$0.079
- Natural Gas $50k 5.9k
MMBtu
$7.30

26

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.7k
MMBtu
8.4%
- Electrical $15k 262k
kWh
11.7%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall