ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Pipeline transportation
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $262k 79k
MMBtu
$3.32
- Electrical $259k 7,714k
kWh
$0.034
- Natural Gas -
-
MMBtu
-

4

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 14k
MMBtu
17.4%
- Electrical $49k 1,342k
kWh
17.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $262k 79k
MMBtu
$3.32
- Electrical $259k 7,714k
kWh
$0.034
- Natural Gas -
-
MMBtu
-

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 2.2k
MMBtu
2.8%
- Electrical $7.6k 213k
kWh
2.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall