ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other direct selling establishments
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $641k 56k
MMBtu
$11.40
- Electrical $306k 5,237k
kWh
$0.058
- Natural Gas $29k 2.7k
MMBtu
$5.43

14

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $100k 15k
MMBtu
26.8%
- Electrical $81k 1,475k
kWh
28.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $557k 58k
MMBtu
$9.68
- Electrical $264k 5,095k
kWh
$0.052
- Natural Gas $58k 5.4k
MMBtu
$10.86

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 2.1k
MMBtu
3.6%
- Electrical $10k 203k
kWh
4.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall