ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other specialty food stores
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $966k 135k
MMBtu
$7.13
- Electrical $200k 5,208k
kWh
$0.038
- Natural Gas $418k 79k
MMBtu
$5.28

12

Recommendations

12.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 12k
MMBtu
8.7%
- Electrical $44k 1,155k
kWh
22.2%
- Natural Gas $4.2k -
MMBtu
-
Waste -
Productivity/Other $56k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $966k 135k
MMBtu
$7.13
- Electrical $200k 5,208k
kWh
$0.038
- Natural Gas $418k 79k
MMBtu
$5.28

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 0.8k
MMBtu
0.6%
- Electrical $3.1k 81k
kWh
1.6%
- Natural Gas ($-0.1)k -
MMBtu
-
Waste -
Productivity/Other $20k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall