ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other specialty food stores
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $816k 95k
MMBtu
$9.56
- Electrical $264k 4,522k
kWh
$0.062
- Natural Gas $265k 48k
MMBtu
$6.12

20

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 6.8k
MMBtu
7.1%
- Electrical $29k 665k
kWh
14.7%
- Natural Gas $2.4k -
MMBtu
-
Waste -
Productivity/Other $28k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $666k 56k
MMBtu
$11.99
- Electrical $328k 3,835k
kWh
$0.086
- Natural Gas $113k 16k
MMBtu
$6.95

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.2k
MMBtu
2.2%
- Electrical $10k 121k
kWh
3.2%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $12k