ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Supermarkets and other grocery (except convenience) stores
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $177k 31k
MMBtu
$9.58
- Electrical $128k 1,509k
kWh
$0.089
- Natural Gas $13k 15k
MMBtu
$7.35

39

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.4k
MMBtu
11.1%
- Electrical $27k 332k
kWh
22.0%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other $7.5k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $196k 37k
MMBtu
$9.15
- Electrical $135k 1,658k
kWh
$0.084
- Natural Gas $17k 20k
MMBtu
$4.99

5

Implemented Recommendations

0.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.9k 0.2k
MMBtu
0.5%
- Electrical $1.7k 19k
kWh
1.1%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1.9k