ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Supermarkets and other grocery (except convenience) stores
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $274k 68k
MMBtu
$7.42
- Electrical $178k 2,227k
kWh
$0.085
- Natural Gas $34k 45k
MMBtu
$4.13

15

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.4k
MMBtu
3.5%
- Electrical $18k 233k
kWh
10.5%
- Natural Gas $2.0k -
MMBtu
-
Waste -
Productivity/Other $23k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $274k 68k
MMBtu
$7.42
- Electrical $178k 2,227k
kWh
$0.085
- Natural Gas $34k 45k
MMBtu
$4.13

5

Implemented Recommendations

1.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.5k 0.4k
MMBtu
0.7%
- Electrical $3.9k 43k
kWh
1.9%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $4.5k