ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Grocery stores
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $211k 52k
MMBtu
$7.73
- Electrical $138k 1,726k
kWh
$0.086
- Natural Gas $26k 34k
MMBtu
$3.10

20

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.0k
MMBtu
3.8%
- Electrical $15k 191k
kWh
11.1%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $17k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $211k 52k
MMBtu
$7.73
- Electrical $138k 1,726k
kWh
$0.086
- Natural Gas $26k 34k
MMBtu
$3.10

8

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.1k 0.4k
MMBtu
0.8%
- Electrical $3.7k 40k
kWh
2.3%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $4.1k
*May be negative reflecting an increased cost component required to save energy and costs overall