ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Grocery stores
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $161k 28k
MMBtu
$9.49
- Electrical $117k 1,380k
kWh
$0.089
- Natural Gas $12k 14k
MMBtu
$6.62

44

Recommendations

4.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.1k
MMBtu
11.2%
- Electrical $25k 306k
kWh
22.1%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other $6.8k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $174k 32k
MMBtu
$9.09
- Electrical $121k 1,479k
kWh
$0.085
- Natural Gas $14k 17k
MMBtu
$4.36

8

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.0k 0.2k
MMBtu
0.6%
- Electrical $1.8k 20k
kWh
1.4%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.0k
*May be negative reflecting an increased cost component required to save energy and costs overall