ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food and beverage stores
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $302k 52k
MMBtu
$8.58
- Electrical $176k 2,148k
kWh
$0.086
- Natural Gas $43k 30k
MMBtu
$3.87

28

Recommendations

5.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.9k
MMBtu
3.7%
- Electrical $15k 188k
kWh
8.7%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $302k 52k
MMBtu
$8.58
- Electrical $176k 2,148k
kWh
$0.086
- Natural Gas $43k 30k
MMBtu
$3.87

13

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.6k 0.6k
MMBtu
1.1%
- Electrical $5.0k 56k
kWh
2.6%
- Natural Gas $0.5k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $5.6k
*May be negative reflecting an increased cost component required to save energy and costs overall