The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $71k | 5.6k |
MMBtu
|
$14.26 |
- Electrical | $66k | 539k |
kWh
|
$0.11 |
- Natural Gas | - | - |
MMBtu
|
- |
9
Recommendations
4.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $2.2k | 0.2k |
MMBtu
|
3.1% |
- Electrical | $2.1k | 17k |
kWh
|
3.2% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $66k | |||
TOTAL | $68k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
2
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $71k | 5.6k |
MMBtu
|
$14.26 |
- Electrical | $66k | 539k |
kWh
|
$0.11 |
- Natural Gas | - | - |
MMBtu
|
- |
4
Implemented Recommendations
2.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $1.4k | 0.1k |
MMBtu
|
2.0% |
- Electrical | $1.3k | 11k |
kWh
|
2.0% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $46k | |||
TOTAL | $47k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |