ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Hardware stores
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $21k 1.7k
MMBtu
$12.87
- Electrical $7.7k 66k
kWh
$0.12
- Natural Gas $11k 1.0k
MMBtu
$10.81

5

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.2k 0.2k
MMBtu
13.5%
- Electrical $3.0k 22k
kWh
32.8%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $5.2k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $21k 1.7k
MMBtu
$12.87
- Electrical $7.7k 66k
kWh
$0.12
- Natural Gas $11k 1.0k
MMBtu
$10.81

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.1k 0.2k
MMBtu
13.5%
- Electrical $3.0k 22k
kWh
32.8%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $3.1k
*May be negative reflecting an increased cost component required to save energy and costs overall