ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Building material and garden equipment and supplies dealers
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $54k 4.3k
MMBtu
$13.79
- Electrical $47k 382k
kWh
$0.11
- Natural Gas $3.5k 0.3k
MMBtu
$3.60

14

Recommendations

4.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.2k 0.2k
MMBtu
4.4%
- Electrical $2.4k 19k
kWh
4.9%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other $44k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $54k 4.3k
MMBtu
$13.79
- Electrical $47k 382k
kWh
$0.11
- Natural Gas $3.5k 0.3k
MMBtu
$3.60

8

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.0k 0.1k
MMBtu
3.4%
- Electrical $1.9k 14k
kWh
3.8%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other $31k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall