ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other motor vehicle dealers
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $21k 1.2k
MMBtu
$17.58
- Electrical $21k 118k
kWh
$0.18
- Natural Gas -
-
MMBtu
-

5

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 0.9k
MMBtu
72.6%
- Electrical $15k 86k
kWh
72.6%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $21k 1.2k
MMBtu
$17.58
- Electrical $21k 118k
kWh
$0.18
- Natural Gas -
-
MMBtu
-

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.1k 0.2k
MMBtu
19.3%
- Electrical $4.1k 23k
kWh
19.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $4.1k
*May be negative reflecting an increased cost component required to save energy and costs overall