ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS New car dealers
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $99k 7.3k
MMBtu
$13.54
- Electrical $84k 668k
kWh
$0.13
- Natural Gas $3.8k 0.5k
MMBtu
$8.09

7

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.1k
MMBtu
14.5%
- Electrical $13k 104k
kWh
15.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $99k 7.3k
MMBtu
$13.54
- Electrical $84k 668k
kWh
$0.13
- Natural Gas $3.8k 0.5k
MMBtu
$8.09

1

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.6k 0.2k
MMBtu
2.8%
- Electrical $2.6k 20k
kWh
2.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.6k
*May be negative reflecting an increased cost component required to save energy and costs overall