The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $103k | 13k |
MMBtu
|
$7.85 |
- Electrical | $45k | 641k |
kWh
|
$0.070 |
- Natural Gas | $57k | 6.6k |
MMBtu
|
$8.73 |
7
Recommendations
7.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $3.9k | 0.6k |
MMBtu
|
4.4% |
- Electrical | $3.9k | 56k |
kWh
|
8.7% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $13k | |||
TOTAL | $17k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $103k | 13k |
MMBtu
|
$7.85 |
- Electrical | $45k | 641k |
kWh
|
$0.070 |
- Natural Gas | $57k | 6.6k |
MMBtu
|
$8.73 |
6
Implemented Recommendations
6.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $2.5k | 0.4k |
MMBtu
|
2.8% |
- Electrical | $2.5k | 36k |
kWh
|
5.7% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $12k | |||
TOTAL | $15k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |