ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Farm product raw material merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $289k 26k
MMBtu
$11.20
- Electrical $131k 1,995k
kWh
$0.066
- Natural Gas $46k 5.3k
MMBtu
$8.62

4

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.8k
MMBtu
7.1%
- Electrical $12k 179k
kWh
9.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $35k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $289k 26k
MMBtu
$11.20
- Electrical $131k 1,995k
kWh
$0.066
- Natural Gas $46k 5.3k
MMBtu
$8.62

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.3k 0.2k
MMBtu
0.9%
- Electrical $1.4k 22k
kWh
1.1%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.3k
*May be negative reflecting an increased cost component required to save energy and costs overall