The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $464k | 216k |
MMBtu
|
$2.15 |
- Electrical | $295k | 4,228k |
kWh
|
$0.070 |
- Natural Gas | $90k | 172k |
MMBtu
|
$0.52 |
4
Recommendations
4.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $19k | 2.7k |
MMBtu
|
1.3% |
- Electrical | $19k | 268k |
kWh
|
6.3% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $19k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $464k | 216k |
MMBtu
|
$2.15 |
- Electrical | $295k | 4,228k |
kWh
|
$0.070 |
- Natural Gas | $90k | 172k |
MMBtu
|
$0.52 |
0
Implemented Recommendations
0.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | - | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |