ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Packaged frozen food merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $781k 391k
MMBtu
$6.52
- Electrical $371k 10,203k
kWh
$3.64
- Natural Gas $239k 286k
MMBtu
$5.94

39

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 11k
MMBtu
2.7%
- Electrical $31k 1,029k
kWh
10.1%
- Natural Gas $9.6k -
MMBtu
-
Waste $2.6k
Productivity/Other $161k
TOTAL $224k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $781k 391k
MMBtu
$6.52
- Electrical $371k 10,203k
kWh
$3.64
- Natural Gas $239k 286k
MMBtu
$5.94

11

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 5.0k
MMBtu
1.3%
- Electrical $13k 483k
kWh
4.7%
- Natural Gas $6.8k -
MMBtu
-
Waste $2.6k
Productivity/Other $5.8k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall