The ITAC Statistics page displays the average assessment results for the selected criteria.
6
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $781k | 391k |
MMBtu
|
$6.52 |
- Electrical | $371k | 10,203k |
kWh
|
$3.64 |
- Natural Gas | $239k | 286k |
MMBtu
|
$5.94 |
39
Recommendations
6.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $61k | 11k |
MMBtu
|
2.7% |
- Electrical | $31k | 1,029k |
kWh
|
10.1% |
- Natural Gas | $9.6k | - |
MMBtu
|
- |
Waste | $2.6k | |||
Productivity/Other | $161k | |||
TOTAL | $224k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
6
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $781k | 391k |
MMBtu
|
$6.52 |
- Electrical | $371k | 10,203k |
kWh
|
$3.64 |
- Natural Gas | $239k | 286k |
MMBtu
|
$5.94 |
11
Implemented Recommendations
1.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 5.0k |
MMBtu
|
1.3% |
- Electrical | $13k | 483k |
kWh
|
4.7% |
- Natural Gas | $6.8k | - |
MMBtu
|
- |
Waste | $2.6k | |||
Productivity/Other | $5.8k | |||
TOTAL | $30k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |