ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS General line grocery merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 51k
MMBtu
$5.10
- Electrical $180k 4,316k
kWh
$0.040
- Natural Gas $24k 6.5k
MMBtu
$15.47

14

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 8.2k
MMBtu
16.2%
- Electrical $47k 800k
kWh
18.5%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 51k
MMBtu
$5.10
- Electrical $180k 4,316k
kWh
$0.040
- Natural Gas $24k 6.5k
MMBtu
$15.47

8

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.2k 0.5k
MMBtu
1.0%
- Electrical $2.4k 50k
kWh
1.2%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $3.2k
*May be negative reflecting an increased cost component required to save energy and costs overall