The ITAC Statistics page displays the average assessment results for the selected criteria.
13
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $544k | 216k |
MMBtu
|
$6.91 |
- Electrical | $289k | 6,639k |
kWh
|
$1.71 |
- Natural Gas | $141k | 148k |
MMBtu
|
$7.37 |
80
Recommendations
6.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $50k | 7.6k |
MMBtu
|
3.5% |
- Electrical | $31k | 738k |
kWh
|
11.1% |
- Natural Gas | $5.2k | - |
MMBtu
|
- |
Waste | $5.2k | |||
Productivity/Other | $74k | |||
TOTAL | $129k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
12
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $573k | 233k |
MMBtu
|
$6.64 |
- Electrical | $304k | 7,029k |
kWh
|
$1.85 |
- Natural Gas | $153k | 161k |
MMBtu
|
$7.98 |
25
Implemented Recommendations
2.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $15k | 3.0k |
MMBtu
|
1.3% |
- Electrical | $10k | 297k |
kWh
|
4.2% |
- Natural Gas | $3.6k | - |
MMBtu
|
- |
Waste | $1.3k | |||
Productivity/Other | $2.9k | |||
TOTAL | $19k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |