The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $760k | 74k |
MMBtu
|
$8.46 |
- Electrical | $686k | 6,948k |
kWh
|
$0.082 |
- Natural Gas | $28k | 2.6k |
MMBtu
|
$10.04 |
18
Recommendations
9.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $165k | 5.4k |
MMBtu
|
7.3% |
- Electrical | $67k | 526k |
kWh
|
7.6% |
- Natural Gas | $6.3k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $10k | |||
TOTAL | $177k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
2
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $760k | 74k |
MMBtu
|
$8.46 |
- Electrical | $686k | 6,948k |
kWh
|
$0.082 |
- Natural Gas | $28k | 2.6k |
MMBtu
|
$10.04 |
4
Implemented Recommendations
2.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $82k | 0.8k |
MMBtu
|
1.1% |
- Electrical | $9.9k | 76k |
kWh
|
1.1% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $82k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |