The ITAC Statistics page displays the average assessment results for the selected criteria.
27
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $800k | 196k |
MMBtu
|
$7.99 |
- Electrical | $439k | 7,452k |
kWh
|
$0.87 |
- Natural Gas | $252k | 120k |
MMBtu
|
$7.63 |
192
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $111k | 9.2k |
MMBtu
|
4.7% |
- Electrical | $49k | 902k |
kWh
|
12.1% |
- Natural Gas | $37k | - |
MMBtu
|
- |
Waste | $2.9k | |||
Productivity/Other | $42k | |||
TOTAL | $156k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
25
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $849k | 209k |
MMBtu
|
$8.08 |
- Electrical | $466k | 7,914k |
kWh
|
$0.93 |
- Natural Gas | $267k | 128k |
MMBtu
|
$7.76 |
76
Implemented Recommendations
3.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $58k | 3.4k |
MMBtu
|
1.6% |
- Electrical | $19k | 333k |
kWh
|
4.2% |
- Natural Gas | $28k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $1.9k | |||
TOTAL | $60k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |