ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Merchant wholesalers, nondurable goods
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $761k 184k
MMBtu
$8.13
- Electrical $417k 7,099k
kWh
$0.81
- Natural Gas $234k 111k
MMBtu
$7.11

200

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 8.8k
MMBtu
4.8%
- Electrical $47k 860k
kWh
12.1%
- Natural Gas $34k -
MMBtu
-
Waste $2.5k
Productivity/Other $39k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

25

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $849k 209k
MMBtu
$8.08
- Electrical $466k 7,914k
kWh
$0.93
- Natural Gas $267k 128k
MMBtu
$7.76

76

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 3.4k
MMBtu
1.6%
- Electrical $19k 333k
kWh
4.2%
- Natural Gas $28k -
MMBtu
-
Waste $0.6k
Productivity/Other $1.9k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall