Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Merchant wholesalers, nondurable goods
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $761k 184k
MMBtu
$8.13
- Electrical $417k 7,099k
kWh
$0.81
- Natural Gas $234k 111k
MMBtu
$7.11

200

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 8.8k
MMBtu
4.8%
- Electrical $47k 860k
kWh
12.1%
- Natural Gas $34k -
MMBtu
-
Waste $2.5k
Productivity/Other $39k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $800k 196k
MMBtu
$7.99
- Electrical $439k 7,452k
kWh
$0.87
- Natural Gas $252k 120k
MMBtu
$7.63

86

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 3.6k
MMBtu
1.8%
- Electrical $21k 352k
kWh
4.7%
- Natural Gas $27k -
MMBtu
-
Waste $0.6k
Productivity/Other $4.9k
TOTAL $63k