Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Miscellaneous durable goods merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $740k 112k
MMBtu
$10.70
- Electrical $356k 10,655k
kWh
$0.066
- Natural Gas $15k 2.6k
MMBtu
$6.43

26

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 19k
MMBtu
17.1%
- Electrical $91k 1,869k
kWh
17.5%
- Natural Gas $6.0k -
MMBtu
-
Waste $3.8k
Productivity/Other -
TOTAL $132k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $846k 127k
MMBtu
$11.89
- Electrical $394k 12,041k
kWh
$0.072
- Natural Gas $17k 3.2k
MMBtu
$3.57

3

Implemented Recommendations

0.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.4k 0.0k
MMBtu
0.0%
- Electrical $0.2k 3.4k
kWh
0.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $6.4k
*May be negative reflecting an increased cost component required to save energy and costs overall