ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Construction and mining (except oil well) machinery and equipment merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,493k 1,565k
MMBtu
$2.23
- Electrical $1,616k 19,390k
kWh
$0.083
- Natural Gas $1,237k 1,366k
MMBtu
$0.91

11

Recommendations

11.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 32k
MMBtu
2.0%
- Electrical $14k 3,098k
kWh
16.0%
- Natural Gas $15k -
MMBtu
-
Waste $29k
Productivity/Other $81k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,493k 1,565k
MMBtu
$2.23
- Electrical $1,616k 19,390k
kWh
$0.083
- Natural Gas $1,237k 1,366k
MMBtu
$0.91

7

Implemented Recommendations

7.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 30k
MMBtu
1.9%
- Electrical $11k 2,960k
kWh
15.3%
- Natural Gas $4.7k -
MMBtu
-
Waste $29k
Productivity/Other $16k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall