ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 42381 Construction and mining (except oil well) machinery and equipment merchant wholesalers

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,493k 1,565k
MMBtu
$2.23
- Electrical $1,616k 19,390k
kWh
$0.083
- Natural Gas $1,237k 1,366k
MMBtu
$0.91

11

Recommendations

11.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 32k
MMBtu
2.0%
- Electrical $14k 3,098k
kWh
16.0%
- Natural Gas $15k -
MMBtu
-
Waste $29k
Productivity/Other $81k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,493k 1,565k
MMBtu
$2.23
- Electrical $1,616k 19,390k
kWh
$0.083
- Natural Gas $1,237k 1,366k
MMBtu
$0.91

7

Implemented Recommendations

7.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 30k
MMBtu
1.9%
- Electrical $11k 2,960k
kWh
15.3%
- Natural Gas $4.7k -
MMBtu
-
Waste $29k
Productivity/Other $16k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall