ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal service centers and other metal merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $439k 54k
MMBtu
$8.96
- Electrical $209k 3,214k
kWh
$0.076
- Natural Gas $131k 21k
MMBtu
$9.76

28

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.1k
MMBtu
7.5%
- Electrical $28k 396k
kWh
12.3%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $439k 54k
MMBtu
$8.96
- Electrical $209k 3,214k
kWh
$0.076
- Natural Gas $131k 21k
MMBtu
$9.76

21

Implemented Recommendations

5.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.2k
MMBtu
2.2%
- Electrical $11k 118k
kWh
3.7%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall