The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,142k | 117k |
MMBtu
|
$9.42 |
- Electrical | $460k | 5,993k |
kWh
|
$0.076 |
- Natural Gas | $538k | 55k |
MMBtu
|
$9.73 |
12
Recommendations
6.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $44k | 4.6k |
MMBtu
|
3.9% |
- Electrical | $38k | 447k |
kWh
|
7.5% |
- Natural Gas | $4.8k | - |
MMBtu
|
- |
Waste | $7.6k | |||
Productivity/Other | $0.6k | |||
TOTAL | $52k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
2
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,142k | 117k |
MMBtu
|
$9.42 |
- Electrical | $460k | 5,993k |
kWh
|
$0.076 |
- Natural Gas | $538k | 55k |
MMBtu
|
$9.73 |
6
Implemented Recommendations
3.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $6.5k | 0.3k |
MMBtu
|
0.2% |
- Electrical | $1.8k | 24k |
kWh
|
0.4% |
- Natural Gas | $4.8k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $0.6k | |||
TOTAL | $7.2k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |