The ITAC Statistics page displays the average assessment results for the selected criteria.
4
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $697k | 67k |
MMBtu
|
$12.05 |
- Electrical | $327k | 3,688k |
kWh
|
$0.10 |
- Natural Gas | $283k | 29k |
MMBtu
|
$12.88 |
25
Recommendations
6.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $36k | 3.7k |
MMBtu
|
5.5% |
- Electrical | $31k | 359k |
kWh
|
9.7% |
- Natural Gas | $5.9k | - |
MMBtu
|
- |
Waste | $3.8k | |||
Productivity/Other | $0.3k | |||
TOTAL | $40k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $697k | 67k |
MMBtu
|
$12.05 |
- Electrical | $327k | 3,688k |
kWh
|
$0.10 |
- Natural Gas | $283k | 29k |
MMBtu
|
$12.88 |
9
Implemented Recommendations
2.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $7.6k | 0.4k |
MMBtu
|
0.7% |
- Electrical | $2.9k | 42k |
kWh
|
1.2% |
- Natural Gas | $4.0k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $0.3k | |||
TOTAL | $7.9k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |