ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other construction material merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $480k 54k
MMBtu
$8.85
- Electrical $195k 2,583k
kWh
$0.075
- Natural Gas $207k 28k
MMBtu
$7.44

11

Recommendations

11.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 4.5k
MMBtu
8.2%
- Electrical $33k 437k
kWh
16.9%
- Natural Gas $56k -
MMBtu
-
Waste -
Productivity/Other $3.0k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $480k 54k
MMBtu
$8.85
- Electrical $195k 2,583k
kWh
$0.075
- Natural Gas $207k 28k
MMBtu
$7.44

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.5k
MMBtu
2.7%
- Electrical $11k 142k
kWh
5.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $3.0k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall