ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Lumber, plywood, millwork, and wood panel merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 69k
MMBtu
$6.31
- Electrical $199k 6,687k
kWh
$0.027
- Natural Gas -
-
MMBtu
-

12

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $138k 14k
MMBtu
20.8%
- Electrical $43k 1,391k
kWh
20.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $22k
TOTAL $160k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 69k
MMBtu
$6.31
- Electrical $199k 6,687k
kWh
$0.027
- Natural Gas -
-
MMBtu
-

8

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 8.2k
MMBtu
12.0%
- Electrical $25k 803k
kWh
12.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $22k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall